Galvanised Steel Case Study – Former Hotel to Apartments Refurb

[vc_row][vc_column][vc_column_text] [/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

Former Hotel – Apartments refurbishment

Project Name:

Former Hotel – Apartments refurb

Location:

Weston, Somerset

Material & Profile:

100mm Round Downpipes & Hopper Heads

 Finish

Galvanised Steel

Job specific details & scope of works

Permission was granted in 2013 to begin the work on regenerating this former hotel, damaged by a fire in 2008 and 2015, but work only got under way in the past year.
Sustainable Britain Ltd and Architects Ascent turned the site into this stunning apartment block of 20 one and two-bedroom flats with sun terraces/full or Juliet balconies or with their own courtyard if they were ground floor apartments.
Rainwater draining off the roof through outlets in the facade spills into the hoppers and down the downpipes. The hoppers give extra capacity for times of higher rainfall. The Galvanised Steel will dull over time as the outer layer oxidizes creating an tough exterior surface protecting the integrity of the metal.

“This (refurb) was a mammoth task – it was a very run down building when we started which has made the transformation all the better!”

Henry of Sustainable Britain Ltd told us.

Below is an image of the hotel before refurbishment began.

13881286904_21edd59384_k_sml

Download the PDF
Browse & Buy Galvanised Steel  products from Rainclear
[/vc_column_text][/vc_column][/vc_row]